Lanes
One lane at a time — the goal, the critical path, and the current wave of blockers.
GO / NO-GO decisionTo do · blockerTacTile v1.0 LAUNCHEDTo do · blockerRemove the Ben Ari simulator auto-loginTo doStrip the iOS device-trust bypass emailTo doRun the cut-list checkpointTo doVerify the full end-to-end customer journeyTo doFreeze the release candidateTo doWrite the launch-day runbookTo doPlan the rolloutTo doAudit both apps for purchase links and upgrade CTAsTo doPlan for store rejectionTo doVerify Stripe is production-ready, not test-modeTo doConfirm the legal documents are actually published and linkedTo doBuild kill switches for the agent and other risky featuresTo doRehearse the rollback before launch dayTo doTake a pre-launch backup and confirm the restore pathTo doVerify the production domain map and DNS before cutoverTo doSet up launch-day monitoring watchTo doPrepare customer support for launchTo doPost-launch watch windowTo do
Wave
Launch & operations
Where everything converges. Pre-release hardening, the cut-list checkpoint, store submissions, and the go/no-go call.
TacTile › Launch TacTile › Launch & operations
0/20 done20 open2 open blockers
Selected taskclear
Write the launch-day runbook
To doOwner · Vivt_5828ff01
Depends on the rollback procedure existing.
Waiting on 2 · 2 still openBuild kill switches for the agent and other risky featuresRehearse the rollback before launch day
Unlocks 1GO / NO-GO decision
Show the prompt
To doIn progressDoneBlockedPick a wave on the left · tap a task to expand it