Lanes
One lane at a time — the goal, the critical path, and the current wave of blockers.
GO / NO-GO decisionTo do · blockerTacTile v1.0 LAUNCHEDTo do · blockerRemove the Ben Ari simulator auto-loginTo doStrip the iOS device-trust bypass emailTo doRun the cut-list checkpointTo doVerify the full end-to-end customer journeyTo doFreeze the release candidateTo doWrite the launch-day runbookTo doPlan the rolloutTo doAudit both apps for purchase links and upgrade CTAsTo doPlan for store rejectionTo doVerify Stripe is production-ready, not test-modeTo doConfirm the legal documents are actually published and linkedTo doBuild kill switches for the agent and other risky featuresTo doRehearse the rollback before launch dayTo doTake a pre-launch backup and confirm the restore pathTo doVerify the production domain map and DNS before cutoverTo doSet up launch-day monitoring watchTo doPrepare customer support for launchTo doPost-launch watch windowTo do
Wave
Launch & operations
Where everything converges. Pre-release hardening, the cut-list checkpoint, store submissions, and the go/no-go call.
TacTile › Launch TacTile › Launch & operations
0/20 done20 open2 open blockers
Selected taskclear
GO / NO-GO decision
To doOwner · met_11328fb4Blocker
This is the last decision before shipping.
Waiting on 9 · 9 still openVerify the full end-to-end customer journeyWrite the launch-day runbookSet up launch-day monitoring watchPlan the rolloutPlan for store rejectionVerify Stripe is production-ready, not test-modeConfirm the legal documents are actually published and linkedVerify the production domain map and DNS before cutoverBuild kill switches for the agent and other risky features
Unlocks 1TacTile v1.0 LAUNCHED
Show the prompt
To doIn progressDoneBlockedPick a wave on the left · tap a task to expand it